An ASX listed uranium mining company
  • Home
  • Corporate
    • About Us
    • Corporate Directory
    • Corporate Governance
    • Board of Directors
    • Management
    • Uranium Sales and Marketing
    • US Nuclear Fuel Working Group
  • Projects
    • Lance Projects
      • Background
      • 2020 Column Leach Studies
      • Ion Exchange Resin Performance
      • MU1A low pH Field Demonstration
      • Regulatory
      • JORC Code Compliant Resources
      • Project Updates
    • Uranium In-situ Recovery
    • Low pH Uranium ISR
    • Karoo Projects
  • Investor Centre
    • Shareholder Information
    • Announcements
    • Quarterly Reports
    • Half Yearly Reports
    • Annual Reports
    • Presentations
    • Broker Research
    • Video
  • Contact

Uranium In-Situ Recovery

  • Lance Projects
    • Background
    • 2020 Column Leach Studies
    • Ion Exchange Resin Performance
    • MU1A low pH Field Demonstration
    • Regulatory
    • JORC Code Compliant Resources
    • Project Updates
  • Uranium In-Situ Recovery
  • Low pH Uranium ISR
  • Karoo Projects South Africa
  • Geology of a Roll Front

    Uranium mineralisation occurs at interface between reduced rocks and oxidied, enriched groundwater.

    The mineralised portion of the roll appears black in the photo below.

    In plan the roll fronts are linear buts sinuous in nature.

    What is In-Situ Leach or In-Situ Recovery?

    Click here to view information from the World Nuclear Association on In-Situ Leaching of Uranium.

    Join our mailing list

    Sitemap

    • Home
    • Corporate
    • Projects
    • Investor Centre
    • Contact

    Postal Address

    PO Box 8129
    Subiaco East WA 6008
    Australia

    Contact Details

    INFO@PEL.NET.AU
    PH +61 8 6263 4461
    FX +61 8 6263 4444

    © Copyright 2021 Peninsula Energy Ltd
    Design by JAZ