An ASX listed uranium mining company
  • Home
  • Corporate
    • About Us
    • Corporate Directory
    • Corporate Governance
    • Board of Directors
    • Management
  • Projects
    • Lance Projects
    • Dagger Project
    • JORC Code Compliant Resources
    • Uranium In-situ Recovery
    • Karoo Projects
  • Investor Centre
    • Shareholder Information
    • Announcements
    • Presentations
    • Sustainability Reports
    • Quarterly Reports
    • Half Yearly Reports
    • Annual Reports
    • Analyst Research
    • Factsheet
    • Video
  • Contact

JORC Code Compliant Resources

  • Lance Projects
  • Dagger Project
  • JORC Code Compliant Resources
  • Uranium In-Situ Recovery
  • Karoo Projects South Africa
  • The JORC-compliant Resource Estimate for the Lance Projects is 58.0 Mlbs, calculated by applying a combined constraint of a GT of 0.2 contour and 200ppm eU3O8. These cut offs are considered to be appropriate for both calculating and reporting of ISR resources at the Lance Projects.

    The measured, indicated and inferred resources are located in host sandstones. Geological modelling of the extensive down-hole geophysical data has accurately defined the impermeable shale and mudstone horizons that form the confining horizons to the mineralised sandstones.

    Lance Projects Resource Estimate as at 31 December 20231

    Resource ClassificationTonnes Ore (M)U3O8 kg (M)U3O8 lbs (M)Grade
    (% U3O8)
    Location
    Measured3.31.73.80.051Wyoming, USA
    Indicated11.05.612.40.051Wyoming, USA
    Inferred38.318.941.70.049Wyoming, USA
    Total52.626.358.00.050 

     

    Dagger Project Resource Estimate* as at October 20231

    Resource Classification

    Tonnes Ore (M)U3O8 kg (M)U3O8 lbs (M)Grade
    (ppm U3O8)
    Location
    Inferred3.03.16.91,037Wyoming, USA
    Total3.03.16.91,037 

    1) JORC Table 1 included in an announcement to the ASX released on 14 November 2018: “Revised Lance Projects Resource Tables”, updated in the “Annual Report to Shareholders” released on 29 September 2023 and ASX Announcement released on 23 October 2023: “Peninsula Establishes Significant New Uranium Project” and ASX Announcement released on 13 May 2024: “Mineral Resource Increases 19.6% Within Current Lance Life Of Mine Plan Area”. Peninsula confirms that it is not aware of any new information or data that materially affects the information included in this announcement and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.

    *Reported above a 0.02% eU3O8 grade and a 0.2 GT cut-off

     

    Competent Persons Statement

    The information on this page that relates to Exploration Results, Mineral Resources or Ore Reserves at the Lance Projects and Dagger Project is based on information compiled by Mr Benjamin Schiffer. Mr Schiffer is a Registered Professional Member of the Society of Mining, Metallurgy and Exploration (Member ID #04170811). Mr Schiffer is a professional geologist employed by independent consultant WWC Engineering. Mr Schiffer has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Schiffer doesn’t hold securities in the Company.

     

    Schedule of Interests in Mining Tenements at 30 September 2023:

    Location / Project NameTenementPercentage
    Private Land (FEE) – Surface Access AgreementApprox. 10,273 acres100%
    Private Land (FEE) – Mineral RightsApprox. 10,568 acres100%
    Federal Mining Claims – Mineral RightsApprox. 18,789 acres100%
    Federal – Surface Access – Grazing LeaseApprox. 40 acres100%
    State Leases – Mineral RightsApprox. 12,184 acres100%
    State Leases – Surface AccessApprox. 314 acres100%
    Strata Owned – Surface AccessApprox. 315 acres100%

    Join our mailing list

      Sitemap

      • Home
      • Corporate
      • Projects
      • Investor Centre
      • Contact

      Postal Address

      PO Box 8129
      Subiaco East WA 6008
      Australia

      Contact Details

      INFO@PEL.NET.AU
      PH +61 8 9380 9920
      FX +61 8 9381 5064

      © Copyright 2025 Peninsula Energy Ltd
      Design by JAZ